Wednesday, January 25, 2006

Interior design and materials for Jcondo

Since it will be roughly 18 months until our unit is ready, LocalTourist took some photos to stare at repeatedly during the long months of waiting to come.

Highly styled kitchen "set" at the sales office of jcondo. The sales office is in a fantastic old brick warehouse on Jay and Front Streets, directly across from the construction site that is "J" condominium.
Under cabinet microwave, and underneath it, a thing they tell me you can use to prepare food for eating.
Dishwasher and sink, grass not included.
The Master bath has high visibility glass walls, "all the better to see you with, my dear".
Double sinks 'cause you can never have too many people in the bathroom at one time.
White marble with grey veins, prrrrreeetty.
Super deep tub in Master bath.

Guest bathroom.
Hanging fixtures that will be used in new condo. Ceiling will be flush, since it is a new building.


Last but not least, real hardwood floors (sample butted up against wall), instead of the more common Pergo (main floor).

No comments: